Precast foundation composed by reinforced elements,that will be connected on site, through post tensioning.
Main advantages to be erected, the procedure will last 2 days: first day setting the elements, and last day links of elements throuugh post tensioning.
The elements, are manufactured on controlled conditions and under systematized procedures industrialized, ensuring the benefits and quality conditions standarized for each.
Less envirormental impacts, no works in wind farm.